B) Identifying constraints that limit production capacity
D) The production schedule is fixed
Break-even compares total cost lines using fixed cost and variable cost across output levels.
Plant layout is the physical arrangement of facilities for smooth flow.
5R includes right quality, quantity, time, source, and price—not advertisement.
Allowances in time study include personal, fatigue, and delay—not import tariff allowance.
Good layout aims to minimize material handling and improve workflow.
Autonomous maintenance involves operators doing routine care to prevent deterioration.
C) Kanban
B) Theory X and Theory Y
Internal failure occurs before delivery (scrap, rework). External failure occurs after delivery.
Vibration analysis is a key predictive maintenance technique for rotating machines.
Pareto chart applies the 80/20 principle to focus on major causes of defects.
Mass production uses assembly-line flow for high volume, low variety output.
Major facility decisions require long-term forecasts (years).
Kaizen means continuous improvement through small, regular improvements.
Routing determines the sequence of operations and work centers for processing a job.
Planning covers job content and resources; scheduling decides the time.
Inventory includes raw materials, WIP, finished goods and spares kept to meet production and demand.
Predictive maintenance is condition-based maintenance (CBM) using monitoring data.