Project scope is the work that must be done to deliver the required product/service/result.
WBS is a hierarchical breakdown of project scope into smaller components.
A work package is the lowest-level WBS component that can be assigned and estimated.
WBS should include 100% of the work defined by the scope (no missing work).
A WBS dictionary provides detailed info about WBS components/work packages.
Responsible, Accountable, Consulted, Informed.
Product scope refers to features/functions of the product. Project scope refers to all the work needed to deliver that product (requirements, design, development, testing, deployment). Clear distinction avoids confusion in planning.